Cottage Project Homepage
Print Logs: First Story, Second Story, Third Story, Miscellaneous
Assembly: First Story, Second Story, Third Story, Miscellaneous


Overview

Overview

Assembly of the Miscellaneous and Props for this building are so straightforward I debating even creating a page for it. The only additional modifications added to the building based on printed files are windows for the 2nd story walls. I simply glued them into place with little to no issue.

If you wish you can also add bricks throughout the walls of the building as they appear to be a consistent addition to the various buildings of the Kingdom of Thamarya set.


Post Process of Cottage

Although adding the windows was relatively easy for the Cottage’s I printed from this kickstarter. I have spent a significant amount of time in the Post Processing and clean up for the building itself. Make sure to check out my Status update and Post Process write up on the subject.

Overview of steps taken before Priming:

  • Gap Filling & Sculpting: Used Drywall compound aka Spackle to clean underside of roofs and milliput for top and fixing a print issue.
  • Magnetizing the floors: To increase structural integrity of the building for easy movability and storage
  • Jettying: Adding my own personal touch to the 2nd story floor for a more realistic medieval look

Also I will talk about the accidental sun warping while priming these pieces and what I did to save the prints.


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s